We have introduced changes to fuel, air conditioning, water and pitot static systems on various aircraft, including the following major projects: * Design of a centre tank system on DC8 * Design of auxiliary toilet waste tanks on Airbus for extended range flights * BAC 1-11 Airstair Installation
|